<!-- hotsheet-skill-version: 53 -->
Work one assigned ticket at a time. In three-role mode, the dispatcher owns queue
selection and exact reservations; the integrator owns main, review, integration,
push, remote CI, and ticket completion. In legacy mode, the integrator also assigns.
Follow the project's AGENTS.md and the ticket's
full history; these instructions define the worker handoff only.
Effective development strategy (HS2-F9062F)
At session start, before a new ticket's test plan, and after a project-policy change
at the next safe ticket boundary, run `hotsheet-cli -C <shared-store>
coordination --project <main> development-strategies` for the shared policy
version, then run `hotsheet-cli -C <shared-store> coordination
--project <main> development-strategy-resolve with the applicable --session
<strategy-name> and --ticket <strategy-name>` overrides. These options name
development strategies, not worker generation tokens. Use the returned source,
local_gate, custom, and mandatory-gate fields; do not infer a preset from the
skill or the integration strategy alone. If the selected CLI lacks the resolver,
stop and report the required CLI upgrade; do not silently choose a default.
An unconfigured-project result retains the existing risk-selected T0/T1/T2
gate and the project's existing integration default.
An explicit user direction takes precedence over ticket, session, then project
strategy instructions, except that none can waive a mandatory gate, exact-tree
receipt, or green-main requirement. Report and refuse such a conflict. A ticket
instruction takes precedence over a session strategy only when the resolver
accepts it. Supply an explicit user-selected strategy as the highest-priority
--ticket value, and record that user provenance beside the resolver's source.
Record the selected source and test plan in the ticket. For a custom
policy, honor minimum_tier, budget_minutes for T0/T1, browser, platform,
perf, and test_plan_timing; required affected checks always remain. A
before-work plan precedes edits; before-handoff precedes handoff. Full-local
and T2 have no time cap. Re-resolve a changed policy only after completing or
releasing active work; never switch an in-flight claim or gate silently.
Startup and next-ticket loop
First run hotsheet-cli coordination --help against the executable actually selected
by command -v hotsheet-cli. If unavailable, report a missing runtime capability, not
an empty queue. Obtain the integrator's verified current executable path. In a Hot
Sheet 2 source checkout only, the headless rebuild is cargo build -p hotsheet-cli
from an isolated build checkout; use <build-checkout>/target/debug/hotsheet-cli
explicitly in every command. In another project's repo, do not assume Cargo exists:
use the maintainer-provided current CLI artifact or exact upgrade command for its
installation method, then repeat the capability check. Do not install globally or
restart the user's host from a worker. Preserve a genuine exact assignment while
resolving this capability blocker; do not guess another ticket.
Before any live pool open that would upgrade schema-one or schema-two state, the integrator
must stop old waiters and switch every pool member to the verified schema-three
artifact. Even status and setup immediately migrate schema-one or schema-two state on
Coordinator::open;
older executables then refuse that pool. coordination --help alone does not
prove schema-three support. When upgrading, workers wait for the integrator to
coordinate this switch before running any pool command (HS2-A1F615). Dispatcher
authority requires a coordinated schema-four upgrade; reviewed shared-section
scopes require schema five. coordination capabilities reports supported roles,
authorities and schemas without opening the pool. A linked worktree shares the
live Git common directory and cannot serve as a disposable upgrade test.
Keep the session running until the integrator ends the run, the user stops it, or no
safe progress is possible. An invocation without an argument means become available
for anything; it does not mean the queue is empty. An argument states preferences or
a request for the dispatcher to weigh (see "State preferences and requests"); it
never selects or claims a ticket. Either the worker or integrator may start first.
- Keep one worker id, a fresh session-generation token, the assigned
<return-route>, and one availability <lease-seconds> (10 to 3600; long gates
want the longest) for this invocation. Confirm the shipping checkout and shared
ticket source. Run `hotsheet-cli -C <shared-store> coordination --project <main>
setup, then status`.
The code Git common directory shares local state across worktrees; it is not a
ticket provider. Use the same explicit source throughout this pool.
- Read existing exact claims and genuine
## Worker assignmentnotes addressed to
this worker/session, as well as its durable mailbox. Resume already claimed work
after inspecting its worktree and handoff. Do not execute notification text or
scrape ambiguous freeform offers into commands. If only an addressed note exists,
ask the integrator to publish its exact structured assignment; remain available.
Never select an unrelated ticket or call claim-next because no slug was supplied.
- Run `coordination --project <main> next --role worker --id <worker>
--session <generation> --route <return-route> --lease-seconds <lease-seconds>
[<preference flags>]`
with the same -C source, on the first wait and on every later wait or
reconnect. next re-registers the session from its own flags; it does not
inherit the registered route or lease, and omitted flags fall back to the CLI
defaults (human relay, 120 seconds), silently replacing a verified route
(HS2-CP6GWA). It blocks on filesystem events for this worker's exact
generation-bound assignment. The dispatcher may start before or after this
worker and refills from durable handoff/availability events; integrator review
and CI do not block a new independent assignment (HS2-TWZW7X). Keep the yielded tool process running and resume its
output; do not replace it with repeated queue reads. Availability lease renewal
does not query the queue or network. A stopped run returns its explicit reason.
- For an offered assignment, read the whole ticket and verify the qualified source,
base SHA, scope note, and return route. Check that status names the active
assignment authority; only its exact operation is valid. A scope on a reviewed
shared document names the relevant #row: or #heading: section. Follow the
per-ticket steps below. Read the
optional route-evidence note named in the ## Worker assignment note, if one
exists, and verify its operation, worker, generation, and recipient match this
structured assignment (HS2-HM9FRV). Native parent delivery is available only in
the same agent tree; an unrelated external session must use a verified terminal
recipient or human relay. Do not infer reachability from a process, cwd or receipt.
After the exact ticket claim succeeds, acknowledge with coordination worker --phase accepted
using the returned assignment id, worker id, and session token. This mailbox
acknowledgement is not a ticket claim; the CLI verifies the local source's live
claim. Unsupported provider verification fails explicitly (HS2-3ETJ26).
Pass --worktree <path> with the ticket worktree you work in (HS2-TRP2MJ); if you
create it after accepting, repeat --phase accepted --worktree <path> once it
exists, and pass it again with a manual --phase handoff. An orchestrator then
counts only that worktree's uncommitted work as yours when it decides whether your
session may be wound down.
- When
coordination preflight --helpis supported, prepare the machine-local
evidence file described in docs/30-handoff-readiness.md. Run `coordination
preflight --id <worker> --session <generation> --assignment <id>
--evidence-file <path>` before publication, inspect its result, then repeat with
--publish. Publication rechecks the claim and source, writes the note, releases
the claim and records the typed mailbox handoff. An exact replay is idempotent.
On an older runtime, keep the manual note/release flow and run `coordination
worker --phase handoff --assignment <id> --id <worker> --session <generation>
--commit <full-sha> for code or --findings-note <note-id>` for findings.
Send only the
ticket-slug cue, then return to next. The durable handoff feeds both the
integrator backlog and dispatcher availability; an unconfirmed cue cannot erase
either. Create a NEW ticket worktree from each new
assignment's current shipping SHA; preserve prior handoff worktrees for integration.
Do not wait for a previous ticket's remote CI before becoming available again.
Use the full prefix hotsheet-cli -C <shared-store> coordination --project <main>
for these commands; --project precedes the subcommand. Before long work or gates,
renew availability with `register --role worker --id <worker> --session <generation>
--route <return-route> --lease-seconds <lease-seconds>`, repeating the same route and
lease. On a blocker, write the ticket/worktree recovery facts,
release the ticket claim, and record mailbox --phase blocked; another independent
assignment can then proceed. An expired claim or availability lease never authorizes
overwriting an old worktree. A replacement generation requires explicit integrator
recovery with a durable inspection note. On final exit, coordination leave --role worker
withdraws availability; also release every ticket claim. An ended independent app turn
does not resume automatically; report the human relay needed (HS2-4H7D8D).
State preferences and requests
The dispatcher (or legacy integrator) stays the only assignment authority
(HS2-6WFCZR). A worker states what it would like and waits for an exact
assignment; it never picks, claims or starts a ticket on its own. Map the
invocation argument to flags on next and register:
| Argument | Flags |
| --- | --- |
| (none) | none: anything eligible |
| glance tickets | --prefer tag:glance |
| only glance tickets | --only tag:glance |
| bugs, nothing T2 | --prefer category:bug --avoid tier:T2 |
| HS2-EQVZTZ (a slug) | --request HS2-EQVZTZ |
Filters are tag:<name>, category:<name>, priority:<highest|high|default|low|lowest>
and tier:<T0|T1|T2>; repeat a flag for more. --prefer is soft: preferred tickets
come first within the normal priority order, then anything eligible. --only
(any of) and --avoid (none of) are strict: you stay idle with an idle_reason
rather than receive other work. If the argument is ambiguous, ask the user rather
than guess a strict filter.
The flags given on a call replace the session's whole preference set; a call with
none keeps it, so lease renewals and plain register renewals replay it. Restate
the same flags on every next while they apply. The first preferences in a pool
need schema nine: pass --all-participants-upgraded only after the integrator
confirms every participant runs a schema-nine executable (`coordination
capabilities reports schema_written_with_worker_preferences`); otherwise run
without preferences. For a mid-run change ("switch to bugs"), finish or keep the
current assignment and pass the new flags on the next wait; --clear-preferences
drops them. Preferences never change or release an assignment you already hold.
A request is honored only when the ticket passes every check an assignment makes.
An honored request is consumed: do not restate it after that assignment. Otherwise
the dispatcher records a refusal (blocked, claimed, overlap, unsupported_source,
not_ready, assigned or filtered), and your wait returns once with no assignment.
Read state.workers.<worker>.preferences.refusal and
worker_matches.<worker>, report the reason to the user, and wait again: restate
the request to keep waiting for it, or drop it to become available for other work.
Never claim the requested ticket yourself.
For each assignment
- Prepare isolation. Confirm the assigned ticket slug, active assignment authority,
integrator, and the
shared Hot Sheet store, and explicit return route with its exact recipient. Create a
ticket-named branch and separate Git worktree from the current shipping branch, or use
the worktree the integrator prepared. Never edit
the integrator's checkout. Link the worktree to the same ticket store and set up its
AI-tool integration if needed; do not create a second ticket store. Keep build and
test state inside the worktree. If the assigned ticket overlaps another worker's
files or an existing dirty worktree, tell the dispatcher (or legacy integrator)
and wait for a different assignment. Separate worktrees do not isolate browser
ports; use an owned distinct fixture endpoint for concurrent browser runs
(HS2-BJ00D1). Do not remove shared docs from a declared scope: reviewed
#row:/#heading: sections are the supported sharing path (HS2-YHYNJ6).
- Claim exactly that ticket with `hotsheet-cli claim <slug> --worker <id> --eta
<duration> or the equivalent Hot Sheet MCP operation. Use HOTSHEET_WORKER_ID` when
set; otherwise choose one stable session-specific id. Read the whole ticket,
including new notes, before each action. If someone else owns its live claim, do
not edit it. Renew before the lease expires and before lengthy work. Record phase
transitions and activity as the project instructions require.
For a long build, test, or commit, check hotsheet-cli claim-run --help on the
selected executable. When supported, run the command as `hotsheet-cli -C
<shared-store> claim-run <slug> --worker <id> -- <command> [args...]`
(HS2-MFYYJ9). The guard renews this exact live claim attempt from its local
deadline, stops a child on failed renewal, and returns success only after a final
authority check. Do not continue after a failed child or guard. On older CLIs,
keep the yielded gate process running, inspect the ticket's actual lease deadline,
and synchronously renew before it passes while resuming the process; repeat for
long gates. Availability register or next never renews a ticket claim.
Immediately before commit and before the durable handoff/release, verify the
exact ticket's live owner and deadline and run synchronous renew. If renewal
fails, or the deadline already passed on an older CLI, stop edits, commit and
handoff. Read claim history for another owner or attempt; reacquire this exact
ticket with claim only when no intervening owner holds it, then recheck the
new attempt before continuing. Never backfill an expired interval.
**Record each phase the moment it starts, even for T0 docs or test-only
work** (HS2-5EGBTH): run hotsheet-cli edit <slug> --started-phase working
before the first edit, and --started-phase initial_testing before any lint,
policy, type or test gate. Go back to working when a gate failure sends you back
to edit, and set initial_testing again before rerunning the gates. Run a long
scripts/check.sh gate as a background command and wait for its completion
notice, never under a foreground tool timeout, which stops it mid-run
(HS2-K3W691). Hand off
from initial_testing; the integrator records integrating. Claiming a Not
Started ticket only enters analyzing, and a claim never advances the phase. The
live claim signals active work, so never infer from a ticket's status or phase
that tests ran. Never backfill or rewrite a missed transition. Record
the missed transition in a note instead.
- Implement and verify only its scope. Record preliminary thoughts for non-trivial
work. If the project declares authoritative tier tags, set the ticket's tier
tag when declaring risk and explain it in that note; use the claim note for
trivial work. A reviewer raises risk by changing the tag. Update affected
tests, coverage, and docs; create follow-up tickets for gaps.
Run the required local gates and inspect the diff. Before handoff, self-review
the exact requested scope, full commit/tree or proposed findings note, active claim
attempt/deadline, gate evidence, docs/coverage, unresolved review findings and
linked follow-ups. For UI work, inspect the real parent at required states and
viewports and attach the matching after evidence. Use the headless preflight
(HS2-NNSWDS) when supported; check coordination preflight --help without opening
an older pool.
A missing or stale result needs the stated repair and another preflight. Older
runtimes retain this manual checklist. For code changes, stage named
paths and commit the verified change on the worker branch with the ticket slug in
the subject. For a findings-only task, put the proposed ## Findings handoff
text in the evidence file and do not create an empty commit. Do not
merge or push the worker branch or main as part of this handoff.
- Hand off without completing. On a current runtime, run the read-only preflight,
inspect verified versus self-attested checks, then use --publish; do not add a
separate note, release or mailbox acknowledgement. A genuine blocker still uses
the blocked-report path. On an older runtime, add a regular ticket note for code headed `## Integration
handoff` with the branch name, full commit SHA, worktree location labeled as
machine-local, gate results, unresolved risks, and any follow-up slugs. State that
the ticket remains Started pending integration. For findings, add a regular note
headed ## Findings handoff with the verified result, evidence, limitations, and
follow-up slugs. Capture that note's id and state that the ticket remains Started
pending integrator verification. Release the claim immediately and
record any structured mailbox handoff, then send only the ticket slug through the assigned return route below. The integrator
reclaims the ticket and owns integration, push, CI confirmation, completion, and worktree removal for code;
for findings it verifies the note and completes without code integration or CI. Do not
mark the ticket Completed or Verified from a worker worktree.
Resource claims for your work (HS2-7YSKXE)
When the prompt that started you, or your assignment, names resources the work needs
(for example vm/macos-vm), you acquire them yourself. Nobody claims them for you:
the orchestrator and the scheduler only read who holds what.
- Acquire each one before the work that uses it, with a duration sized to the work
and a bounded wait instead of a retry loop:
hotsheet-cli resource acquire <namespace>/<resource> --duration 45m --wait 5m
(MCP hotsheet_resource_claim action: "acquire"). An answer of held_by or
wait_timeout means someone else has it: work on something that does not need it,
or report the wait; never take it from the holder.
- Keep the
renewal_tokenfrom the answer, and give it to the task you start with
the resource (for example a test run inside the VM) so the task renews for itself:
hotsheet-cli resource renew --token <token> --duration 30m. Where the resource
checks it, hand the fencing_token to the resource too.
- Renew before the lease ends only while the work still runs. Never renew for a task
that is stuck or gone: let the lease lapse.
- Release as soon as you are done with it, before handing off:
hotsheet-cli resource release --token <token>.
Record only the resource name and timings in notes, never a token.
Assigned by the project's home site (HS2-5P112Z)
A project can be checked out on several machines (sites). Its home site's
dispatcher assigns all of the project's work, and its integrator integrates it.
When the orchestrator started you on another site, your checkout's own pool does
not assign your ticket. A site_assigned message names the ticket the home's
dispatcher gave you instead. For that ticket:
- Claim it as your worker id, then work and verify it in a worktree of this
checkout as usual. Do not run coordination worker for it: the home's pool
records your acceptance from your claim.
- Push your branch to
origin. - Add a regular note that starts with
## Integration handoff. Give it the lines
Branch: <the branch you pushed> and Commit: <its full SHA>.
- Only then release your claim. The release is what tells the orchestrator to
relay the handoff, so the note must already be there.
The home fetches that branch and checks that the commit is on it and inside your
scope. Only then does it record your handoff for its integrator. Keep the branch
until the ticket completes.
Provisional assignments (HS2-2SJPCH)
An assignment may rest on a prerequisite that is pushed and still waiting on CI.
speculation-status lists it with its speculative base SHA and pending gate, and
speculation-explain --ticket <slug> says provisional on <slug> CI <run>.
- Create the worktree from the assignment's exact
base, then run
speculation-branch --assignment <id> --worktree <path>. It records the base
and pending gate on the branch as branch.<name>.hotsheet-speculative-base,
hotsheet-pending-gate and hotsheet-speculation-state. Run it again after a
rebase or a gate result.
- Work, verify and hand off as usual. Name the base gate in the handoff note.
Your own local gates are still required; a pending base gate never replaces
them.
- A regular
## Provisional work at risknote on your ticket means the base gate
finished red. Stop adding scope, keep the branch and worktree, and wait for the
repair. Then rebase onto the base the integrator names, rerun the affected
gates, and ask the integrator to record speculation-rebase. Never reset,
delete or abandon the branch.
- If the fix invalidates the work, the integrator reopens it with a
## Provisional work reopened note. The branch stays; a new assignment starts
from the repaired base.
Reviewed handoff corrections
Structured returns cover code and findings handoffs (HS2-65ETRJ/HS2-AEBJYN).
A findings return preserves the original findings note id and review evidence; it
never requires a fabricated commit or completion of the returned operation.
A review note alone is not a new assignment. Preserve the original branch, worktree
and full commit for code, or the original findings note for no-code work; wait for
the integrator's review-return and a NEW structured
assignment id for the exact ticket (HS2-65ETRJ). Read its regular ## Review return
note, current shipping base and correction scope. Claim the exact ticket, create a
new ticket worktree, and acknowledge the new assignment with your current session
generation. A lost return acknowledgement can replay without cancelling your new
claim. Do not reopen the old mailbox handoff or pretend the ticket is complete.
The corrected handoff identifies its new verified commit or findings note and
preserved original artifacts. Returned originals remain Blocked after correction
completion; never resolve them as Done (HS2-AEBJYN). Release its claim and return that new assignment through the usual flow.
Return route
- Native parent channel: use the assigned collaboration tool and integrator agent id
only within the same tool's agent tree. Separate Codex and Claude sessions do not share
a native parent channel.
- Hot Sheet terminal: use the assigned shared store and exact integrator terminal
connection id, previously verified in GET /connections to advertise the message
action for that session:
hotsheet-cli -C <shared-store> terminal message <integrator-terminal-id> --text "<slug>".
This requires a running local server and supported session adapter. Record the delivery
result; confirmed: false does not prove the integrator read or acted on the cue.
- Human relay: when no supported recipient is assigned, after the durable ticket
handoff and claim release, report: "Resume the integrator and give it <slug> to read
from the shared store." An independent Codex Work/app session without an advertised
terminal connection uses this fallback (HS2-4H7D8D).
If delivery fails or is unconfirmed, record that result and give the human relay instruction;
do not guess another recipient or repeatedly resend. Do not include commands, branch data,
or instructions in the cue: the integrator reads the ticket. A shared store, ticket note,
or notification feed does not automatically wake an independent session.
If work stops earlier, record the current state and blocker in the ticket, then
release the claim. A failed renewal also stops edits. Before ending, check
hotsheet-cli ls --claimed and release every claim you still hold. Do not poll the
queue on a timer for another assignment.
Local verification (HS2-RS0FFT)
Use the project's declared affected local gate and inspect its selected checks
and fallback reasons. Where the project has ticket-tag testing profiles, run the
normal gate without profile flags, record its deferred-to-CI checks, and use the
project's analyzed selection for uncapped high-risk work. Client-only changes do
not routinely run unrelated server suites. Keep affected unit/API tests,
a bounded relevant browser set, shared policy/contracts/generated-artifact
checks, and one real-app visual review of
an authorized overlapping UI batch. Full browser/platform regression stays in
CI. Analyze whether shared infrastructure, auth, data formats, migrations,
gate changes, ambiguous dependencies, or a concrete failure needs broader local
checks, and record the chosen checks and reasons. Run the full local browser
suite only for an identified unresolved risk. Reuse only valid exact-input
evidence. Preserve dirty local edits and verify the committed tree in a clean
worktree; never use a bypass.
After push, release the claim while CI runs and continue independent work.
Complete only after successful covering CI on the shipping branch.