Algo sc safety stock

From charlieviettq/awesome-agent-skill · View interactive version

Algo sc safety stock is an AI agent skill from the GitHub repository charlieviettq/awesome-agent-skill. \"Calculate safety stock levels to buffer against demand and lead time uncertainty. Use this skill when the user needs to set inventory buffers, determine service level trade-offs, or optimize safety stock across SKUs — even if they say 'how much buffer inventory', 'stockout prevention', or 'service

How to use this skill

Skill file

Safety Stock Calculation

Overview

Safety stock is buffer inventory held to protect against demand and lead time variability. Formula: SS = z × √(LT × σ²_d + d² × σ²_LT) where z=service factor, LT=lead time, σ_d=demand std dev, d=avg demand, σ_LT=lead time std dev. Directly trades inventory cost against stockout risk.

When to Use

Trigger conditions:

When NOT to use:

Algorithm

IRON LAW: Safety Stock Is a TRADE-OFF, Not a Target
More safety stock = fewer stockouts but higher holding cost.
The relationship is non-linear: going from 95% to 99% service level
roughly DOUBLES safety stock. Going from 99% to 99.9% doubles it
again. Always quantify the cost of each service level increment.
z-values: 90%→1.28, 95%→1.65, 99%→2.33, 99.9%→3.09.

Phase 1: Input Validation

Collect: historical demand data (weekly/monthly), lead time data (average and variability), target service level, unit cost and holding rate.

Gate: Minimum 12 periods of demand data, lead time estimates available.

Phase 2: Core Algorithm

  1. Compute demand statistics: average demand (d), demand standard deviation (σ_d)
  2. Compute lead time statistics: average LT, LT standard deviation (σ_LT)
  3. Compute combined variability: σ_combined = √(LT × σ²_d + d² × σ²_LT)
  4. Look up z for target service level
  5. Safety stock = z × σ_combined
  6. Reorder point = d × LT + SS

Phase 3: Verification

Simulate: using historical demand, would the computed SS have prevented stockouts at the target service level?

Gate: Simulated service level matches target (±2%).

Phase 4: Output

Return safety stock with cost impact and service level analysis.

Output Format

{
  "safety_stock": 250,
  "reorder_point": 850,
  "service_level": 0.95,
  "annual_holding_cost": 5000,
  "metadata": {"avg_demand_weekly": 120, "demand_cv": 0.3, "avg_lead_time_weeks": 5}
}

Examples

Sample I/O

Input: Weekly demand: avg=100, σ=30. Lead time: avg=4 weeks, σ=1 week. Target: 95%.

Expected: σ_combined = √(4×900 + 10000×1) = √(3600+10000) = √13600 = 116.6. SS = 1.65 × 116.6 = 192 units.

Edge Cases

| Input | Expected | Why |

|-------|----------|-----|

| Zero demand variability | SS from LT variability only | σ_d = 0, only lead time risk remains |

| Zero lead time variability | SS from demand variability only | σ_LT = 0, standard formula simplifies |

| Very long lead time | High SS | More uncertainty accumulates over longer periods |

Gotchas

Scripts

| Script | Description | Usage |

|--------|-------------|-------|

| scripts/safety_stock.py | Compute safety stock and reorder point with combined demand/lead-time variability | python scripts/safety_stock.py --help |

Run python scripts/safety_stock.py --verify to execute built-in sanity tests.

References

Use this skill with your AI agent: Open on Skill Issue to copy, download, or add to your library. Works with Claude, ChatGPT, Gemini, Cursor, Windsurf and more.