Retrospective is an AI agent skill from the GitHub repository striderZA/OpenCodeGameStudios. Generates a sprint or milestone retrospective by analyzing completed work, velocity, blockers, and patterns. Produces actionable insights for the next iteration.

How to use this skill

Skill file

Phase 1: Parse Arguments

Determine whether this is a sprint retrospective (sprint-N) or a milestone retrospective (milestone-name).


Phase 1b: Check for Existing Retrospective

Before loading any data, glob for an existing retrospective file:

(also check production/sprints/sprint-[N]-retrospective.md as an alternate location)

If a matching file is found, present the user with:

An existing retrospective was found: [filename]

[A] Update existing retrospective — load it and add/revise sections
[B] Start fresh — generate a new retrospective, archiving the old one

Wait for user selection before continuing. If updating, read the existing file and

carry its content forward into the generation phase, revising sections with new data.


Phase 2: Load Sprint or Milestone Data

Read the sprint or milestone plan from the appropriate location:

If the file does not exist or is empty, output:

"No sprint data found for [sprint/milestone]. Run /sprint-status to generate

sprint data first, or provide the sprint details manually."

Then use question to present two options:

tasks, dates, and outcomes; use that as the source of truth for the retrospective.

If the user chooses [A], collect the data and continue to Phase 3 using what they provide.

If the user chooses [B], stop here.

Extract: planned tasks, estimated effort, owners, and goals.

Read the git log for the period covered by the sprint or milestone to understand what was actually committed and when.


Phase 3: Analyze Completion and Trends

Scan for completed and incomplete tasks by comparing the plan against actual deliverables. Check for:

Scan the codebase for TODO/FIXME trends:

Read previous retrospectives (if any) from production/sprints/ or production/milestones/ to check:


Phase 4: Generate the Retrospective

## Retrospective: [Sprint N / Milestone Name]
Period: [Start Date] -- [End Date]
Generated: [Date]

### Metrics

| Metric | Planned | Actual | Delta |
|--------|---------|--------|-------|
| Tasks | [X] | [Y] | [+/- Z] |
| Completion Rate | -- | [Z%] | -- |
| Story Points / Effort Days | [X] | [Y] | [+/- Z] |
| Bugs Found | -- | [N] | -- |
| Bugs Fixed | -- | [N] | -- |
| Unplanned Tasks Added | -- | [N] | -- |
| Commits | -- | [N] | -- |

### Velocity Trend

| Sprint | Planned | Completed | Rate |
|--------|---------|-----------|------|
| [N-2] | [X] | [Y] | [Z%] |
| [N-1] | [X] | [Y] | [Z%] |
| [N] (current) | [X] | [Y] | [Z%] |

**Trend**: [Increasing / Stable / Decreasing]
[One sentence explaining the trend]

### What Went Well
- [Observation backed by specific data or examples]
- [Another positive observation]
- [Recognize specific contributions or decisions that paid off]

### What Went Poorly
- [Specific issue with measurable impact -- e.g., "Feature X took 5 days
  instead of estimated 2, blocking tasks Y and Z"]
- [Another issue with impact]
- [Do not assign blame -- focus on systemic causes]

### Blockers Encountered

| Blocker | Duration | Resolution | Prevention |
|---------|----------|------------|------------|
| [What blocked progress] | [How long] | [How it was resolved] | [How to prevent recurrence] |

### Estimation Accuracy

| Task | Estimated | Actual | Variance | Likely Cause |
|------|-----------|--------|----------|--------------|
| [Most overestimated task] | [X] | [Y] | [+Z] | [Why] |
| [Most underestimated task] | [X] | [Y] | [-Z] | [Why] |

**Overall estimation accuracy**: [X%] of tasks within +/- 20% of estimate

[Analysis: Are we consistently over- or under-estimating? For which types of
tasks? What adjustment should we apply?]

### Carryover Analysis

| Task | Original Sprint | Times Carried | Reason | Action |
|------|----------------|---------------|--------|--------|
| [Task that was not completed] | [Sprint N-X] | [N] | [Why] | [Complete / Descope / Redesign] |

### Technical Debt Status
- Current TODO count: [N] (previous: [N])
- Current FIXME count: [N] (previous: [N])
- Current HACK count: [N] (previous: [N])
- Trend: [Growing / Stable / Shrinking]
- [Note any areas of concern]

### Previous Action Items Follow-Up

| Action Item (from Sprint N-1) | Status | Notes |
|-------------------------------|--------|-------|
| [Previous action] | [Done / In Progress / Not Started] | [Context] |

### Action Items for Next Iteration

| # | Action | Owner | Priority | Deadline |
|---|--------|-------|----------|----------|
| 1 | [Specific, measurable action] | [Who] | [High/Med/Low] | [When] |
| 2 | [Another action] | [Who] | [Priority] | [When] |

### Process Improvements
- [Specific change to how we work, with expected benefit]
- [Another improvement -- keep it to 2-3 actionable items, not a wish list]

### Summary
[2-3 sentence overall assessment: Was this a good sprint/milestone? What is
the single most important thing to change going forward?]

Phase 5: Save Retrospective

Present the retrospective and top findings to the user (completion rate, velocity trend, top blocker, most important action item).

Ask: "May I write this to production/sprints/sprint-[N]-retrospective.md?" (or the milestone path if applicable)

If yes, write the file, creating the directory if needed. Verdict: COMPLETE — retrospective saved.

If no, stop here. Verdict: BLOCKED — user declined write.


Phase 6: Next Steps

Guidelines